Last Updated: Aug 29, 2026
No. of Questions: 90 Questions & Answers with Testing Engine
Download Limit: Unlimited
Choosing our 1Z0-244 study torrent as your study guide means you choose a smart and fast way to get succeed in the certification exam.The Oracle 1Z0-244 real questions together with the verified answers will boost your confidence to solve the difficulty in the Oracle EBS R12: Advanced Supply Chain Planning actual test and help you pass.
SureTorrent has an unprecedented 99.6% first time pass rate among our customers.
We're so confident of our products that we provide no hassle product exchange.
| Section | Objectives |
|---|---|
| Topic 1: Advanced Supply Chain Planning Concepts | - ASCP architecture and components
|
| Topic 2: Supply Planning and Optimization | - Advanced Supply Chain Planning optimization
|
| Topic 3: Plan Analysis and Execution | - Planner Workbench usage
|
| Topic 4: Demand Planning and Forecasting | - Forecast generation and consumption
|
Question 1
The MSO:Enable Decision Rules profile option is set to "No." Then a Constrained but not Optimized plan Is run.
Identify three statements that are true.
A. Alternate BOMs will not be considered.
B. Default Demand priorities will be considered in the order of Sales Order, Forecast, and Safety Stock.
C. Alternate Routings will not be considered.
D. Alternate BOMs will be considered.
E. Substitute items will be considered.
Question 2
Select two correct statements about standard operations.
A. Standard operations are used only in a flow manufacturing environment.
B. If you assign the operation code of standard operation in a routing, the standard operation information Is copied into the operation that you are currently defining.
C. You cannot modify the standard operation information after adding the information into your new operation.
D. Standard operations are commonly used operations that you can define as a template for use in defining future routing operations.
E. When defining resource setup Information, there Is no option of specifying the standard operations used during changeovers.
Question 3
Identify four costs from the source system that are considered by an ASCP Optimized Plan.
A. Resource Cost
B. Transportation Cost
C. Ordering Cost
D. Inventory Carrying Cost
E. Item Cost
F. Warranty Replacement Cost
Question 4
During the data migration phase, there are items having routing with up to 10,000 sequence numbers. These need to be migrated to Oracle.
What specific action needs to be performed (If any) to migrate this data Into Oracle?
A. Set the BOM parameter "Numbering Method" with the required value.
B. You must Import the routing in two stages with 1-5000 and 5001-10000.
C. No specific action needs to be taken for importing data with 10,000 sequence numbers.
D. The highest allowed sequence number is 9999, therefore this limitation needs to be conveyed to the client before migration.
E. Set two routings: one primary (1-5000 steps) and the remaining steps with an alternate label.
Question 5
Identify the four correct features that Optimized plans automatically choose (on the basis of minimizing plan objective cost).
A. Alternate Bills of Material
B. Alternate Routings
C. Non-standard Work Orders
D. Items
E. Substitute Components
F. Alternate Resources
G. Lead times
H. Purchase Requisitions
Solutions:
| Question 1 Answer: B | Question 2 Answer: B,D | Question 3 Answer: A,B,C,E | Question 4 Answer: E | Question 5 Answer: A,B,E,F |
Over 56295+ Satisfied Customers

Magee
Haley
Jonathan
Martin
Owen
Sebastian
SureTorrent is the world's largest certification preparation company with 99.6% Pass Rate History from 56295+ Satisfied Customers in 148 Countries.